After the outcome of the Dumri by-election, a new train connecting New Giridih and Ranchi will begin service on September 12
After the outcome of the Dumri by-election, a new train connecting New Giridih and Ranchi will begin service on September 12
The route for the eagerly anticipated new train between New Giridih and Ranchi has been made evident. After the September 5 by-election in the Dumri legislative constituency and the September 8 election results, the train will be back on schedule. On August 17, the inauguration was first suggested. Due to the electoral code of conduct, the inauguration that was supposed to take place in August was postponed.
Dhanbad. The route for the eagerly anticipated new train between New Giridih and Ranchi has been made evident. After the September 5 bye-election in the Dumri assembly constituency and the September 8 election results, the train will be back on schedule. On August 17, the inauguration was first suggested.
Due to the electoral code of conduct, the inauguration that was supposed to take place in August was postponed. The Railway Board has now approved running this train. The East Central Railway has set the opening date and received the board's approval. On September 12, a brand-new train between Giridih and Ranchi will debut.
The New Giridih Ranchi Inaugural Special train will be flagged off from New Giridih station at 10:00 am on September 12th with the display of the green flag. At Jamua, Dhanwar, Maheshpur, Koderma, Hazaribagh Town, Barkakana, Mesra, and Tati Sylve, this train will halt.
Annapurna, a minister for the union, might indicate "go."
At New Giridih station, Union Minister of State for Education Annapurna Devi can signal the train to depart. even though it hasn't been declared in a formal manner yet.
Train service will resume on September 13
Beginning on September 13, this train will run regularly between New Giridih and Ranchi. The operation of trains from the Barkakana-Mesra rail line has now been halted due to landslides and the sliding of hill rocks. The train will only travel via Barkakana-Mesra if everything return to normal before September 12. In the event that things do not return to normal, the train will go from Barkakana to Ranchi via Muri.
No comments:
Post a Comment